Difference between revisions of "Central sterile services department"
Line 36: | Line 36: | ||
Activities in a CSSD can functionally be sorted under the following primary zones: | Activities in a CSSD can functionally be sorted under the following primary zones: | ||
− | * Dirty Decontamination Zone | + | *Dirty Decontamination Zone |
− | * Clean IAP (Inspection and Packing Zone) | + | *Clean IAP (Inspection and Packing Zone) |
− | * Sterile Clean Zone | + | *Sterile Clean Zone |
In addition to the above primary zones, supporting activities are accommodated in the CSSD. | In addition to the above primary zones, supporting activities are accommodated in the CSSD. | ||
Line 57: | Line 57: | ||
The main activities of the “decontamination life cycle” taking place in a CSSD can be listed as follows: | The main activities of the “decontamination life cycle” taking place in a CSSD can be listed as follows: | ||
− | * receiving of soiled (and contaminated) returns | + | *receiving of soiled (and contaminated) returns |
− | * cleaning of trolleys | + | *cleaning of trolleys |
− | * sorting returned trays | + | *sorting returned trays |
− | * sorting, disassembling, cleaning and drying of all returned medical devices | + | *sorting, disassembling, cleaning and drying of all returned medical devices |
− | * checking functionality and cleanliness of cleaned medical devices | + | *checking functionality and cleanliness of cleaned medical devices |
− | * assembling, packing and wrapping of trays | + | *assembling, packing and wrapping of trays |
− | * sterilisation | + | *sterilisation |
− | * cooling of sterile packs | + | *cooling of sterile packs |
− | * storage of sterilised items | + | *storage of sterilised items |
− | * dispatching of orders | + | *dispatching of orders |
− | * quality control | + | *quality control |
− | * maintenance | + | *maintenance |
− | * record keeping | + | *record keeping |
− | * receiving new supplies. | + | *receiving new supplies. |
These activities can be classified under the following functional areas: | These activities can be classified under the following functional areas: | ||
Line 123: | Line 123: | ||
==Decontamination zone== | ==Decontamination zone== | ||
− | * Receiving and sorting | + | *Receiving and sorting |
− | * Waste disposal | + | *Waste disposal |
− | * Cleaner/sluice | + | *Cleaner/sluice |
− | * Trolley wash | + | *Trolley wash |
− | * Manual cleaning | + | *Manual cleaning |
− | * Automated cleaning | + | *Automated cleaning |
− | * Raw materials and chemicals storage | + | *Raw materials and chemicals storage |
− | * PPE area (gowning). | + | *PPE area (gowning). |
Figure 7: Areas related to the decontamination zone | Figure 7: Areas related to the decontamination zone | ||
Line 136: | Line 136: | ||
==Inspection and packing zone (IAP Zone)== | ==Inspection and packing zone (IAP Zone)== | ||
− | * Inspection and packing (IAP) | + | *Inspection and packing (IAP) |
− | * Sterile pack | + | *Sterile pack |
− | * Textile folding | + | *Textile folding |
− | * Raw materials storage | + | *Raw materials storage |
− | * PPE area (gowning). | + | *PPE area (gowning). |
Figure 8: Areas related to the inspection and packing zone | Figure 8: Areas related to the inspection and packing zone | ||
Line 146: | Line 146: | ||
==Sterile zone== | ==Sterile zone== | ||
− | * Sterilisation | + | *Sterilisation |
− | * Cooling | + | *Cooling |
− | * Sterile pack storage | + | *Sterile pack storage |
− | * Dispatch. | + | *Dispatch. |
Figure 9: Areas related to the clean zone | Figure 9: Areas related to the clean zone | ||
Line 155: | Line 155: | ||
==Support zone== | ==Support zone== | ||
− | * Office | + | *Office |
− | * Staff rest room | + | *Staff rest room |
− | * Kitchenette | + | *Kitchenette |
− | * Female change room | + | *Female change room |
− | * Male change room | + | *Male change room |
− | * Manager’s office | + | *Manager’s office |
− | * Steriliser plant room. | + | *Steriliser plant room. |
Figure 10: Areas related to the support zone | Figure 10: Areas related to the support zone | ||
Line 194: | Line 194: | ||
Planning and design features to support infection control should include the following: | Planning and design features to support infection control should include the following: | ||
− | * Restricted/controlled access | + | *Restricted/controlled access |
− | * Unidirectional work flow, progressing from dirty to clean to sterile areas | + | *Unidirectional work flow, progressing from dirty to clean to sterile areas |
− | * Controlled air flow with positive air pressure from clean to dirty areas | + | *Controlled air flow with positive air pressure from clean to dirty areas |
− | * Containment of steam and moisture, preventing potential contamination of stored sterile articles. | + | *Containment of steam and moisture, preventing potential contamination of stored sterile articles. |
− | * Building and layout details that would facilitate easy cleaning | + | *Building and layout details that would facilitate easy cleaning |
− | * Selection of suitable building materials and finishes | + | *Selection of suitable building materials and finishes |
− | * Selection of fixtures, fittings and equipment with suitable detail, materials and finishes for easy cleaning, and prevention of build-up of harmful organisms | + | *Selection of fixtures, fittings and equipment with suitable detail, materials and finishes for easy cleaning, and prevention of build-up of harmful organisms |
− | * Adequate facilities for cleaning and waste management | + | *Adequate facilities for cleaning and waste management |
− | * Access to the area should be limited and controlled. This should prevent any unauthorised person from entering the area without permission | + | *Access to the area should be limited and controlled. This should prevent any unauthorised person from entering the area without permission |
− | * Staff/visitors should have access to hand-washing facilities, separate from those used for cleaning devices, before entering or leaving the areas. | + | *Staff/visitors should have access to hand-washing facilities, separate from those used for cleaning devices, before entering or leaving the areas. |
− | * The flow of both staff and equipment must allow no cross-over of soiled and clean materials | + | *The flow of both staff and equipment must allow no cross-over of soiled and clean materials |
− | * The operating procedure for infection control in a CSSD falls outside the scope of this guideline. | + | *The operating procedure for infection control in a CSSD falls outside the scope of this guideline. |
==Design for Occupational, Health and Safety== | ==Design for Occupational, Health and Safety== | ||
Planning and design features to support occupational health and safety include the following: | Planning and design features to support occupational health and safety include the following: | ||
− | * Selection of floor finishes with a non-slip finish | + | *Selection of floor finishes with a non-slip finish |
− | * Selection of fixtures, fittings and equipment with suitable detail, materials and finishes to prevent personal injury through accidents or misuse | + | *Selection of fixtures, fittings and equipment with suitable detail, materials and finishes to prevent personal injury through accidents or misuse |
− | * Provision of suitable and adequate facilities to support and encourage a high level of personal hygiene, with special reference to hand hygiene | + | *Provision of suitable and adequate facilities to support and encourage a high level of personal hygiene, with special reference to hand hygiene |
− | * Provision of adequate dispensing points for the appropriate personal protection items (PPE) for the specific area to enable strict enforcement of PPE requirements in the protection of healthcare workers, especially as preventive measures against HIV aids | + | *Provision of adequate dispensing points for the appropriate personal protection items (PPE) for the specific area to enable strict enforcement of PPE requirements in the protection of healthcare workers, especially as preventive measures against HIV aids |
− | * Top-loading, worktop equipment should be accessible to staff members of all heights | + | *Top-loading, worktop equipment should be accessible to staff members of all heights |
− | * Ill-considered dimensions and layouts of fixtures and fittings could have a significant negative effect on occupational health and safety of staff. | + | *Ill-considered dimensions and layouts of fixtures and fittings could have a significant negative effect on occupational health and safety of staff. |
As the requirements of the Occupational Health and Safety Act will apply, this section needs to be read in conjunction with the OHS-related guidelines. | As the requirements of the Occupational Health and Safety Act will apply, this section needs to be read in conjunction with the OHS-related guidelines. | ||
Line 222: | Line 222: | ||
Although it is difficult to predict future trends in CSSD technology, it is advisable to allow some flexibility and adaptability in space requirements, electrical consumption and layout, and also in air-handling capacity. Current trends that need to be considered are the following: | Although it is difficult to predict future trends in CSSD technology, it is advisable to allow some flexibility and adaptability in space requirements, electrical consumption and layout, and also in air-handling capacity. Current trends that need to be considered are the following: | ||
− | * The increasing complexity of surgical procedures requires more intricate equipment and instruments that need specialised care and handling during the sterilisation procedure | + | *The increasing complexity of surgical procedures requires more intricate equipment and instruments that need specialised care and handling during the sterilisation procedure |
− | * Integrated computerised tracking facilities have become widely used and have become an essential tool in the validation of the sterilisation process | + | *Integrated computerised tracking facilities have become widely used and have become an essential tool in the validation of the sterilisation process |
− | * Changing staff-flow patterns due to changing work-flow patterns as a result of procedural and/or equipment innovations | + | *Changing staff-flow patterns due to changing work-flow patterns as a result of procedural and/or equipment innovations |
− | * Design towards sustainable architecture, i.e. water-saving equipment, and equipment with reduced toxic emissions. Constant improvements and innovations lead to products that run more economically and reach a higher level of environment compatibility | + | *Design towards sustainable architecture, i.e. water-saving equipment, and equipment with reduced toxic emissions. Constant improvements and innovations lead to products that run more economically and reach a higher level of environment compatibility |
− | * The facility should be able to reasonably accommodate access and positioning of possible outsize equipment. Consideration for this possibility should be given from (and including) point of delivery to point of positioning | + | *The facility should be able to reasonably accommodate access and positioning of possible outsize equipment. Consideration for this possibility should be given from (and including) point of delivery to point of positioning |
− | * It is advisable to allow capacity for extra machinery in the event of increased production demand. | + | *It is advisable to allow capacity for extra machinery in the event of increased production demand. |
==Ergonomic and user-comfort considerations== | ==Ergonomic and user-comfort considerations== | ||
Line 243: | Line 243: | ||
Noise must be controlled | Noise must be controlled | ||
− | * A threshold of 60dBA (decibel) must not be exceeded | + | *A threshold of 60dBA (decibel) must not be exceeded |
− | * The walls and ceilings should be made of absorbent materials so that they do not reflect sound | + | *The walls and ceilings should be made of absorbent materials so that they do not reflect sound |
− | * Insulation of sterilisers and washer-disinfectors in technical walls will reduce the noise level | + | *Insulation of sterilisers and washer-disinfectors in technical walls will reduce the noise level |
− | * Offices should allow confidential discussions to take place in privacy, away from noisy mechanical or high-volume human areas. | + | *Offices should allow confidential discussions to take place in privacy, away from noisy mechanical or high-volume human areas. |
==Natural light== | ==Natural light== | ||
Line 261: | Line 261: | ||
=CSSD Area Determination= | =CSSD Area Determination= | ||
− | == Determination of size and layout == | + | ==Determination of size and layout== |
The size of a CSSD in a hospital is unique to that hospital, as the size, layout and function of a CSSD are defined in the Operational Policy Statement that guides the operational management of the hospital. The operational policies specific to the CSSD precede sketch design stage. These policies are developed by the project team in consultation with health; service stakeholders, who should have the knowledge and experience to analyse the various processes in and related to the CSSD. | The size of a CSSD in a hospital is unique to that hospital, as the size, layout and function of a CSSD are defined in the Operational Policy Statement that guides the operational management of the hospital. The operational policies specific to the CSSD precede sketch design stage. These policies are developed by the project team in consultation with health; service stakeholders, who should have the knowledge and experience to analyse the various processes in and related to the CSSD. | ||
These operational policies define the “What, How, When, Where, Who and With What” of any activity and/or process and are major space determinants which could significantly affect the planning and design of the CSSD, as they can have an impact on the size, configuration and the nature of accommodation. Operational policies will vary from unit to unit depending on a wide range of factors, both external and internal to the CSSD. | These operational policies define the “What, How, When, Where, Who and With What” of any activity and/or process and are major space determinants which could significantly affect the planning and design of the CSSD, as they can have an impact on the size, configuration and the nature of accommodation. Operational policies will vary from unit to unit depending on a wide range of factors, both external and internal to the CSSD. | ||
− | === Determining factors external to the CSSD === | + | ===Determining factors external to the CSSD=== |
Examples of these space determinants could include the following: | Examples of these space determinants could include the following: | ||
− | * number of theatres/case mix | + | *number of theatres/case mix |
− | * surgical procedures | + | *surgical procedures |
− | * extent of storage in the theatres and wards | + | *extent of storage in the theatres and wards |
− | * distribution system that will be used (vertical, horizontal, trolleys, lifts) | + | *distribution system that will be used (vertical, horizontal, trolleys, lifts) |
− | * amount of space needed for waste management | + | *amount of space needed for waste management |
− | * processing needs for re-usable textiles (receiving, transporting, collecting, storing) | + | *processing needs for re-usable textiles (receiving, transporting, collecting, storing) |
− | * staff facilities to be shared with adjacent departments. See annexure A for a generic set of Standard Operating Policies (SOP) for a typical sterile service department. | + | *staff facilities to be shared with adjacent departments. See annexure A for a generic set of Standard Operating Policies (SOP) for a typical sterile service department. |
− | === Determining factors internal to the CSSD === | + | ===Determining factors internal to the CSSD=== |
Examples of these space determinants could include the following: | Examples of these space determinants could include the following: | ||
− | * types of processing equipment to be used (washer, washer-disinfectors, single- or multi-chamber washers, ultrasonic cleaners, endoscope processors) | + | *types of processing equipment to be used (washer, washer-disinfectors, single- or multi-chamber washers, ultrasonic cleaners, endoscope processors) |
− | * types of packaging to be used (disposable wraps and pouches, re-usable wraps, rigid containers | + | *types of packaging to be used (disposable wraps and pouches, re-usable wraps, rigid containers |
− | * echnology to be used for sterilisation (high temperature or low temperature sterilisation, other chemical sterilants, steam) | + | *echnology to be used for sterilisation (high temperature or low temperature sterilisation, other chemical sterilants, steam) |
− | * anticipated inventory storage | + | *anticipated inventory storage |
− | * anticipated volume of consumable supplies | + | *anticipated volume of consumable supplies |
− | * type of documentation and record-keeping system to be used (manual vs computerised) | + | *type of documentation and record-keeping system to be used (manual vs computerised) |
− | * instrument inventory | + | *instrument inventory |
− | * equipment inventory | + | *equipment inventory |
− | * projected workload | + | *projected workload |
− | * staffing structure – number of offices | + | *staffing structure – number of offices |
− | * staffing policy - number of staff to be accommodated | + | *staffing policy - number of staff to be accommodated |
− | * types of cleaning equipment selected such as multi chamber or single chamber | + | *types of cleaning equipment selected such as multi chamber or single chamber |
− | * number of sterilisers and whether front or double sided loading | + | *number of sterilisers and whether front or double sided loading |
− | * emergency sterilisation requirements. | + | *emergency sterilisation requirements. |
− | === CSSD area determination === | + | ===CSSD area determination=== |
Hoët (1989 cited in AFS Working Group, 2008b, p.281) has estimated the following ratios as a broadbased calculation of CSSD space: | Hoët (1989 cited in AFS Working Group, 2008b, p.281) has estimated the following ratios as a broadbased calculation of CSSD space: | ||
− | * 0.7 m²/bed from 0 to 300 beds | + | *0.7 m²/bed from 0 to 300 beds |
− | * 0.6 m²/bed from 300 to 600 beds | + | *0.6 m²/bed from 300 to 600 beds |
− | * 0.5 m²/bed for more than 600 beds. | + | *0.5 m²/bed for more than 600 beds. |
Based on these ratios, the following table can be compiled: | Based on these ratios, the following table can be compiled: | ||
Line 367: | Line 367: | ||
Studies done by Putsep and Cowan (1983, p.8) produced the following ratios depending on the ‘active’ nature of the bed. | Studies done by Putsep and Cowan (1983, p.8) produced the following ratios depending on the ‘active’ nature of the bed. | ||
− | + | Table 4: Comparative recommendations for estimating the size of a CSSD (Putsep and Cowan,1983, p.8) | |
{| class="wikitable" | {| class="wikitable" | ||
|'''NR OF ''' | |'''NR OF ''' | ||
'''BEDS''' | '''BEDS''' | ||
− | |'''SCANDINAVIA''' | + | |'''SCANDINAVIA''' |
− | |'''BELGIUM''' | + | | '''BELGIUM''' |
|'''NETHERLANDS''' | |'''NETHERLANDS''' | ||
− | |'''RSA<sup>1</sup>''' | + | | '''RSA<sup>1</sup>''' |
|- | |- | ||
− | | | + | | |
− | + | | colspan="3" | '''m² PER BED''' | |
− | | colspan=" | ||
| | | | ||
|- | |- | ||
Line 418: | Line 417: | ||
|'''RSA<sup>3</sup>''' | |'''RSA<sup>3</sup>''' | ||
|- | |- | ||
− | | | + | | |
− | + | | colspan="4" | '''TOTAL AREA''' | |
− | | colspan=" | ||
− | |||
|- | |- | ||
|200 BEDS | |200 BEDS | ||
Line 451: | Line 448: | ||
It is however; clear that the size of a CSSD cannot be generically determined on the basis of statistics or averages. Every CSSD has its own set of area determinants that need to be logically evaluated in order to arrive at an area that is the optimal combination of functionality and cost effectiveness. | It is however; clear that the size of a CSSD cannot be generically determined on the basis of statistics or averages. Every CSSD has its own set of area determinants that need to be logically evaluated in order to arrive at an area that is the optimal combination of functionality and cost effectiveness. | ||
− | + | == Proportional allocation of space in a CSSD facility == | |
− | + | Table 5: Space allocation in a CSSD (Putsep and Cowan,1983, p.9) | |
− | |||
{| class="wikitable" | {| class="wikitable" | ||
|'''AREA''' | |'''AREA''' | ||
Line 527: | Line 523: | ||
|15 | |15 | ||
|} | |} | ||
+ | |||
+ | AFS Working Group (2008b, p.291) states that the areas within the CSSD can be sub-divided as follows: | ||
+ | |||
+ | Receiving: 10% of the surface area | ||
+ | |||
+ | Decontamination: 25% of the surface area | ||
+ | {| class="wikitable" | ||
+ | | colspan="2" |'''DIRTY 35%''' | ||
+ | |||
+ | |||
+ | IAP 35% of the surface area | ||
+ | |- | ||
+ | | colspan="2" |'''CLEAN''' '''35%''' | ||
+ | |||
+ | |||
+ | Sterile Storage 20% of the surface area | ||
+ | |- | ||
+ | | colspan="2" |'''STERILE''' '''20%''' | ||
+ | |||
+ | |||
+ | Annexes: 10% of the surface area | ||
+ | |} | ||
+ | '''SUPPORT 10%''' | ||
+ | |||
+ | If the generic plan used as basis for this study (LAYOUT 2.1) is subjected to an area analysis, the following table can be compiled (TABLE 4.5) for an autonomous (support services not shared) CSSD of 600m². If staff facilities and corridors are shared with another department (e.g. theatre department), the CSSD’s size reduces to 450m² as per TABLE 4.6, illustrating the difficulty in achieving universally applicable areas, and the effect of hospital-specific policies. | ||
+ | |||
+ | It is significant that the percentage of total areas of TABLE 4.6 compares favourably with the AFS Working Group’s recommendations. | ||
+ | |||
+ | Table 6: Proportional space allocation - Generic layout (600M<sup>2</sup> gross area) | ||
+ | {| class="wikitable" | ||
+ | | colspan="5" | '''DIRTYCLEANSTERILE SUPPORT''' | ||
+ | |- | ||
+ | | | ||
+ | |Area (m²) | ||
+ | |Area (m²) | ||
+ | |Area (m²) | ||
+ | |Area (m²) | ||
+ | |- | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |WASTE DISPOSAL | ||
+ | |12 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |SLUICE | ||
+ | |12 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |RECEIVING & SORTING | ||
+ | |25 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |TROLLEY WASH | ||
+ | |5 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |TROLLEY HOLDING | ||
+ | |5 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |STORE | ||
+ | |12 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |PPE TO DECON AREA | ||
+ | |8 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |DECONTAMINATION AREA | ||
+ | |100 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |PPE TO IAP AREA | ||
+ | | | ||
+ | |8 | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |STORE | ||
+ | | | ||
+ | |12 | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |TEXTILE AREA | ||
+ | | | ||
+ | |16 | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |INSPECTION & PACKING | ||
+ | | | ||
+ | |100 | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |STERILIZATION | ||
+ | | | ||
+ | |30 | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |DISPATCH | ||
+ | | | ||
+ | | | ||
+ | |15 | ||
+ | | | ||
+ | |- | ||
+ | |STERILE STORE | ||
+ | | | ||
+ | | | ||
+ | |40 | ||
+ | | | ||
+ | |- | ||
+ | |COOLING | ||
+ | | | ||
+ | | | ||
+ | |30 | ||
+ | | | ||
+ | |- | ||
+ | |STERILIZER PLANT ROOM | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |18 | ||
+ | |- | ||
+ | |OFFICE | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |12 | ||
+ | |- | ||
+ | |KITCHENETTE | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |12 | ||
+ | |- | ||
+ | |STAFF REST ROOM | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |35 | ||
+ | |- | ||
+ | |FEMALE CHANGE | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |30 | ||
+ | |- | ||
+ | |MALE CHANGE | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |15 | ||
+ | |- | ||
+ | |CSSD CORRIDOR | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |48 | ||
+ | |- | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |'''TOTAL AREA (SQ M) ''' | ||
+ | |'''179''' | ||
+ | |'''166''' | ||
+ | |'''85''' | ||
+ | |'''170''' | ||
+ | |- | ||
+ | |'''% OF TOTAL AREA ''' | ||
+ | |'''30%''' | ||
+ | |'''28%''' | ||
+ | |'''14%''' | ||
+ | |'''28%''' | ||
+ | |} | ||
+ | Table 7: Proportional space allocation - Generic layout without staff facilities (450M<sup>2</sup> gross area) | ||
+ | {| class="wikitable" | ||
+ | | colspan="5" | '''DIRTY CLEAN STERILE SUPPORT''' | ||
+ | |- | ||
+ | | | ||
+ | |Area (m²) | ||
+ | |Area (m²) | ||
+ | |Area (m²) | ||
+ | |Area (m²) | ||
+ | |- | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |WASTE DISPOSAL | ||
+ | |12 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |SLUICE | ||
+ | |12 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |RECEIVING & SORTING | ||
+ | |25 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |TROLLEY WASH | ||
+ | |5 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |TROLLEY HOLDING | ||
+ | |5 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |STORE | ||
+ | |12 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |PPE TO DECON AREA | ||
+ | |8 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |DECONTAMINATION AREA | ||
+ | |100 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |PPE TO IAP AREA | ||
+ | | | ||
+ | |8 | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |STORE | ||
+ | | | ||
+ | |12 | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |TEXTILE AREA | ||
+ | | | ||
+ | |16 | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |INSPECTION & PACKING | ||
+ | | | ||
+ | |100 | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |STERILIZATION | ||
+ | | | ||
+ | |30 | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |DISPATCH | ||
+ | | | ||
+ | | | ||
+ | |15 | ||
+ | | | ||
+ | |- | ||
+ | |STERILE STORE | ||
+ | | | ||
+ | | | ||
+ | |40 | ||
+ | | | ||
+ | |- | ||
+ | |COOLING | ||
+ | | | ||
+ | | | ||
+ | |30 | ||
+ | | | ||
+ | |- | ||
+ | |STERILIZER PLANT ROOM | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |18 | ||
+ | |- | ||
+ | |OFFICE | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |12 | ||
+ | |- | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |'''TOTAL AREA (SQ M) ''' | ||
+ | |'''179''' | ||
+ | |'''166''' | ||
+ | |'''85''' | ||
+ | |'''30''' | ||
+ | |- | ||
+ | |'''% OF TOTAL AREA ''' | ||
+ | |'''39%''' | ||
+ | |'''36%''' | ||
+ | |'''18%''' | ||
+ | |'''7%''' | ||
+ | |} | ||
+ | |||
+ | == Typical Floor Layouts == | ||
+ | The following generic plans are included to illustrate the combined effect of gross floor area allocation, proportional space allocation, and work-flow requirements. | ||
+ | |||
+ | Drawing 1: Typical floor layout (Small - 250M² gross area) not to scale '''Proportional Net space allocation''' | ||
+ | {| class="wikitable" | ||
+ | |DIRTY | ||
+ | |37% | ||
+ | |- | ||
+ | |CLEAN | ||
+ | |36% | ||
+ | |- | ||
+ | |STERILE | ||
+ | |21% | ||
+ | |- | ||
+ | |SUPPORT | ||
+ | |6% | ||
+ | |} | ||
+ | Drawing 2: Typical floor layout (Medium - 400M² gross area) not to scale '''Proportional Net space allocation''' | ||
+ | {| class="wikitable" | ||
+ | |DIRTY | ||
+ | |38% | ||
+ | |- | ||
+ | |CLEAN | ||
+ | |33% | ||
+ | |- | ||
+ | |STERILE | ||
+ | |22% | ||
+ | |- | ||
+ | |SUPPORT | ||
+ | |7% | ||
+ | |} | ||
+ | Drawing 3: Typical floor layout (Large - 600M² gross area) not to scale '''Proportional Net space allocation''' | ||
+ | {| class="wikitable" | ||
+ | |DIRTY | ||
+ | |30% | ||
+ | |- | ||
+ | |CLEAN | ||
+ | |28% | ||
+ | |- | ||
+ | |STERILE | ||
+ | |14% | ||
+ | |- | ||
+ | |SUPPORT | ||
+ | |28% | ||
+ | |} | ||
+ | |||
+ | = Individual Space Requirements = | ||
+ | |||
+ | == CSSD Layout Unpacked == | ||
+ | Due to the uni-directional sequential nature of the work flow in the CSSD, activities are interrelated and inter-dependent. It is, therefore, critical to the functional efficiency and safety of the CSSD that those areas are sequentially linked for uni-directional flow-through of instrumentation, with no room for back tracking. | ||
+ | |||
+ | The above work flow and interrelationship between the adjacent areas dictates the characteristics of each space. In order to discuss each area individually, it is necessary to have a base plan as a reference point. The typical floor layout based on a 600m<sup>2</sup> unit will be used for this purpose. | ||
+ | |||
+ | Drawing 4: A generic layout to illustrate room layouts | ||
+ | |||
+ | == Receiving and Sorting == | ||
+ | |||
+ | === Function === | ||
+ | This is the area where all soiled articles for reprocessing are received on trolleys from the main corridor from user departments throughout the hospital. | ||
+ | |||
+ | === Location and Relationship === | ||
+ | |||
+ | * Close to main entry doors to the CSSD unit | ||
+ | |||
+ | * Visual access to main entry. | ||
+ | |||
+ | Drawing 5: Receiving and sorting | ||
+ | |||
+ | === Activities === | ||
+ | |||
+ | * Access for deliveries of supplies, return of contaminated goods and the collection of waste and contaminated linen | ||
+ | * Contaminated articles are received at a counter with a trolley hatch, where the articles are logged, sorted and forwarded to the decontamination area | ||
+ | |||
+ | * Contaminated linen is put into linen bags and stored in the waste-disposal store for transport to the laundry | ||
+ | * Supplies are received in the supplies store where they are opened and packaging is discarded in the waste-disposal store | ||
+ | * Trolleys are sent to the trolley wash bay. | ||
+ | |||
+ | === Requirements === | ||
+ | |||
+ | * Visual access to entrance doors | ||
+ | |||
+ | * All entrances should be secure and controlled by means of communication to prevent access by unauthorised people | ||
+ | * A glass partition with lockable sliding hatch between this area and the corridor • A lockable hatch for trolleys | ||
+ | * The red-line principle is applicable at the receiving area; only material and trolleys are to enter the CSSD via this entrance • Worktop for unpacking and sorting | ||
+ | * Hand-washing facilities. | ||
+ | |||
+ | === Fixtures, fittings and equipment === | ||
+ | |||
+ | * Receiving counter with pass-through hatch and trolley hatch, acting as red line | ||
+ | * Sorting work tables – standing height | ||
+ | * Clinical hand-wash basin, complete with liquid soap dispenser and paper-towel dispenser • Space should be allowed for record-keeping and record-keeping supplies. | ||
+ | |||
+ | Photograph 7: Trolley pass-through hatch (Tygerberg hospital) | ||
+ | |||
+ | === Services === | ||
+ | |||
+ | * 2 x telephones | ||
+ | * 2 x data points | ||
+ | * CSSD technician call system | ||
+ | * Power outlets for computer points, computer, fax and printer | ||
+ | |||
+ | * Access control to outside door. | ||
+ | |||
+ | == Waste Disposal == | ||
+ | '''Function''' | ||
+ | |||
+ | Contaminated waste articles are stored for collection and transport to the respective disposal areas. | ||
+ | |||
+ | === Location and relationship === | ||
+ | Attached to the receiving area. | ||
+ | |||
+ | Drawing 6: Waste disposal | ||
+ | |||
+ | === Activities === | ||
+ | |||
+ | * The sluice area and waste-disposal area could be combined in smaller units | ||
+ | * Contaminated waste articles are temporarily stored for collection and transport to the respective disposal areas | ||
+ | |||
+ | * Contaminated linen is temporarily stored in canvas bags for collection and transport to the laundry | ||
+ | * Third-party collection area (depot). | ||
+ | |||
+ | Categories of waste stored in the waste-disposal area could include: | ||
+ | |||
+ | * Health-care waste, infectious waste, sharps | ||
+ | * General office waste | ||
+ | |||
+ | * Packaging and cartons from bulk supplies stored in the unit • Linen bags used to collect reusable items | ||
+ | * Sharps from theatres. | ||
+ | |||
+ | === Requirements === | ||
+ | |||
+ | * An independent secure area for temporary storage of clinical waste awaiting collection in accordance with local waste management policy | ||
+ | * The door to the receiving/sorting area side should be lockable from the CSSD side to prevent unauthorised entry | ||
+ | |||
+ | * Room layout should allow for easy recycling/re-use/disposal policy | ||
+ | * Space for linen bags and waste containers | ||
+ | * An impermeable, hard-wearing floor with good drainage; it should be easy to clean and to disinfect, with an accessible water supply for cleaning purposes | ||
+ | * The area should be protected from outside elements, inaccessible to animals, insects or birds and not situated in close proximity to fresh food stores, food preparation areas or patient waiting areas | ||
+ | * It should be sized according to the volume of waste generated by the facility as well as the frequency of collection. | ||
+ | |||
+ | * A bumper rail to protect the wall behind the trolleys • Containers according to waste policy. | ||
+ | |||
+ | Photograph 8: Soiled-Linen trolleys | ||
+ | |||
+ | Photograph 9: Infectious-waste and sharps-disposal containers | ||
+ | |||
+ | === '''Fixtures, fittings and equipment '' ''''' === | ||
+ | • Clinical hand-wash basin, complete with liquid-soap dispenser and paper-towel dispenser. | ||
+ | |||
+ | == Sluice == | ||
+ | |||
+ | === '''Function''' === | ||
+ | Heavily soiled items are rinsed and waste items are discarded in suitable containers. | ||
+ | |||
+ | 4.2. Location and relationship | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
− | {{Expand}} | + | <br />{{Expand}} |
<references /><br /> | <references /><br /> | ||
[[Category:Support Services]] | [[Category:Support Services]] |
Revision as of 09:59, 12 October 2020
Contents
- 1 General Planning Considerations
- 2 Functional Requirements
- 2.1 Activity zones in a typical CSSD
- 2.2 Decontamination zone
- 2.3 Inspection and packing zone (IAP Zone)
- 2.4 Sterile zone
- 2.5 Support zone
- 2.6 Workflow
- 2.7 Material flow
- 2.8 Personnel flow
- 2.9 Air flow
- 2.10 General design considerations
- 2.11 Design for infection control
- 2.12 Design for Occupational, Health and Safety
- 2.13 Design for change and technology
- 2.14 Ergonomic and user-comfort considerations
- 2.15 Sound
- 2.16 Natural light
- 2.17 Natural ventilation
- 2.18 Communication
- 3 CSSD Area Determination
- 4 Individual Space Requirements
General Planning Considerations
Sterilisation department in a hospital
The sterilisation department in a hospital is known by many acronyms, e.g.:
CSD Central Sterilisation Department
CPD Central Processing Area
SSD Sterile Service Department
TSSD Theatre Sterile Service Department
TSSU Theatre Sterile Service Unit
CSSD Central Sterile Service Department (the most widely used term in the South African context)
Location and functional relationship
Functional relationships to other departments
See Figure 1. The CSSD should be centrally located with ready access to all related service areas, such as the ICU, in-patient units and emergency unit. The department should also have direct access, either horizontally or vertically, to the operating theatres.
Deliveries and transportation routes
Trolleys are used as mode of transport for both receivables and deliveries. In order to cater for the high volume of trolleys to and from the CSSD receiving and dispatch areas, the entry/exit points should ideally be separated to create a uni-directional traffic flow and also to avoid cross-contamination through the division of the clean and dirty material.
Access for plant and equipment maintenance
Plant and equipment in service areas would need access from outside the CSSD, in order not to compromise the desired level of cleanliness in the unit. In some situations direct access between the plant area and the steriliser is required in order to allow access for maintenance staff to the equipment controls in the CSSD area side.
Figure 1: Departmental relationships (IUSS:GNS Adult Inpatient Services)
Primary function of a CSSD
The primary function of a CSSD is to provide an efficient, economic, continuous and quality supply of sterilised items, when needed, to all patient-care service points in the hospital, and to receive returned contaminated items for cleaning. This process is generally referred to as the “decontamination life cycle” (see Figure 2).
Figure 2: Decontamination life cycle
Activities in a CSSD can functionally be sorted under the following primary zones:
- Dirty Decontamination Zone
- Clean IAP (Inspection and Packing Zone)
- Sterile Clean Zone
In addition to the above primary zones, supporting activities are accommodated in the CSSD.
Support zone
In order to identify the functional relationship between the various spaces, the convention is used throughout this guide to indicate the respective zones in the following colours:
In order to create a work space for maintaining a clean environment suitable for handling sterile articles, access to the red, blue and green zones is restricted and subjected to “red-line” principle.
In addition to the above, the red area (decontamination zone) is divided with a hard barrier from the IAP area, in order to prevent contaminated particles from freely entering the relatively cleaner IAP area. This barrier could be a solid brick wall, or glass wall.
Activities comprising the decontamination cycle should allow a progressive work-flow pattern that commences with a “dirty” entry and receiving area, proceeds to a cleaning, decontamination and drying area, into a sorting and packing area, through to sterilisation and cooling area, to finish with sterile storage, distribution and exit areas.
Figure 3: Work flow through the primary zones
Activities in a CSSD
The main activities of the “decontamination life cycle” taking place in a CSSD can be listed as follows:
- receiving of soiled (and contaminated) returns
- cleaning of trolleys
- sorting returned trays
- sorting, disassembling, cleaning and drying of all returned medical devices
- checking functionality and cleanliness of cleaned medical devices
- assembling, packing and wrapping of trays
- sterilisation
- cooling of sterile packs
- storage of sterilised items
- dispatching of orders
- quality control
- maintenance
- record keeping
- receiving new supplies.
These activities can be classified under the following functional areas:
Decontamination
Decontamination involves the use of automated and manual cleaning to remove harmful blood-borne pathogens on the surfaces of equipment and instruments. Soiled items for re-use (medical devices, textiles and equipment) are received in the sterilising department after use in the various clinical departments. These could be operating theatres, emergency department and various wards. Medical devices, equipment and other contaminated articles will be sorted, disassembled, pre-rinsed and cleaned in the decontamination/dirty area. Used linen is put into linen bags and sent to the laundry. Waste items are sorted into suitable containers, according to policy, for appropriate disposal methods.
If items are heavily soiled a manual washing procedure will precede the automated cleaning process by washer-disinfectors. For manual cleaning, a double- (two-) sink arrangement is optimal, one for cleaning and one for rinsing. Automated washers or washer-disinfectors can be provided as single or double-door designs (the latter to allow for physical separation of the dirty and clean areas of the decontamination area).
Photograph 1: Manual cleaning
Photograph 2: Automated cleaning
Inspection
Decontaminated medical devices and equipment are visually inspected for functionality, damage and cleanliness according to required standards, the manufacturer’s instructions and written protocols.
Photograph 3:
Packing
Decontaminated instruments, equipment and other articles are sorted, assembled, counted and packed prior to sterilizing.
Photograph 4:
Sterilisation
Sterilisation is a defined process used to render a surface or product free from viable organisms, including bacterial spores. Depending on the product this procedure could vary from steam sterilisation, dry heat sterilisation, to low temperature sterilising processes.
Photograph 5:
Storage
Sterile items are stored in a clean controlled environment to prevent re-contamination before use.
Photograph 6:
Figure 4: The decontamination life cycle at a glance
Functional Requirements
Activity zones in a typical CSSD
Figure 5: Dispatch points in the decontamination cycle
Figure 5 above is a variation of the generic ‘decontamination life cycle’, indicating the various dispatch points in the cycle.
Based on this principle, the activity spaces in a CSSD could be organised as per figure 6
Figure 6: Configuration of activity spaces
Decontamination zone
- Receiving and sorting
- Waste disposal
- Cleaner/sluice
- Trolley wash
- Manual cleaning
- Automated cleaning
- Raw materials and chemicals storage
- PPE area (gowning).
Figure 7: Areas related to the decontamination zone
Inspection and packing zone (IAP Zone)
- Inspection and packing (IAP)
- Sterile pack
- Textile folding
- Raw materials storage
- PPE area (gowning).
Figure 8: Areas related to the inspection and packing zone
Sterile zone
- Sterilisation
- Cooling
- Sterile pack storage
- Dispatch.
Figure 9: Areas related to the clean zone
Support zone
- Office
- Staff rest room
- Kitchenette
- Female change room
- Male change room
- Manager’s office
- Steriliser plant room.
Figure 10: Areas related to the support zone
Functional relationship between activity spaces
Figure 11: Functional relationship between activity spaces
Workflow
Design solutions should follow work-flow principles, separating dirty and clean areas. The workspaces in the decontamination and clean areas should be designed as open-plan work areas subdivided by benches and/or equipment into functional work areas. These work areas should be arranged to allow for a progressive work flow that commences with a ‘dirty’ entry and receiving area, proceeding to a cleaning, decontamination and drying area, into a sorting and packing area, through to a sterilisation- and cooling area, with sterile storage, distribution and exit areas completing the process.
It is critical to the functional efficiency and safety of the CSSD that these spaces are sequentially linked for one-way flow-through of instrumentation. The separation between the dirty area, where soiled goods are collected, and the clean area where washed and disinfected instruments are inspected, sorted and packed, is realised by a high throughput pass-through washer disinfector barrier.
Treated instruments are unloaded and managed directly in the clean packing area by different staff.
Figure 12: Work flow through the zones
Material flow
Figure 13: Material flow through the zones
Personnel flow
Figure 14: Personnel flow through the zones
Air flow
Figure 15: Air flow through the zones
General design considerations
Design for infection control
The design of a CSSD plays an essential role in addressing infection control issues to minimise the risk of infection transmission.
Planning and design features to support infection control should include the following:
- Restricted/controlled access
- Unidirectional work flow, progressing from dirty to clean to sterile areas
- Controlled air flow with positive air pressure from clean to dirty areas
- Containment of steam and moisture, preventing potential contamination of stored sterile articles.
- Building and layout details that would facilitate easy cleaning
- Selection of suitable building materials and finishes
- Selection of fixtures, fittings and equipment with suitable detail, materials and finishes for easy cleaning, and prevention of build-up of harmful organisms
- Adequate facilities for cleaning and waste management
- Access to the area should be limited and controlled. This should prevent any unauthorised person from entering the area without permission
- Staff/visitors should have access to hand-washing facilities, separate from those used for cleaning devices, before entering or leaving the areas.
- The flow of both staff and equipment must allow no cross-over of soiled and clean materials
- The operating procedure for infection control in a CSSD falls outside the scope of this guideline.
Design for Occupational, Health and Safety
Planning and design features to support occupational health and safety include the following:
- Selection of floor finishes with a non-slip finish
- Selection of fixtures, fittings and equipment with suitable detail, materials and finishes to prevent personal injury through accidents or misuse
- Provision of suitable and adequate facilities to support and encourage a high level of personal hygiene, with special reference to hand hygiene
- Provision of adequate dispensing points for the appropriate personal protection items (PPE) for the specific area to enable strict enforcement of PPE requirements in the protection of healthcare workers, especially as preventive measures against HIV aids
- Top-loading, worktop equipment should be accessible to staff members of all heights
- Ill-considered dimensions and layouts of fixtures and fittings could have a significant negative effect on occupational health and safety of staff.
As the requirements of the Occupational Health and Safety Act will apply, this section needs to be read in conjunction with the OHS-related guidelines.
Design for change and technology
Although it is difficult to predict future trends in CSSD technology, it is advisable to allow some flexibility and adaptability in space requirements, electrical consumption and layout, and also in air-handling capacity. Current trends that need to be considered are the following:
- The increasing complexity of surgical procedures requires more intricate equipment and instruments that need specialised care and handling during the sterilisation procedure
- Integrated computerised tracking facilities have become widely used and have become an essential tool in the validation of the sterilisation process
- Changing staff-flow patterns due to changing work-flow patterns as a result of procedural and/or equipment innovations
- Design towards sustainable architecture, i.e. water-saving equipment, and equipment with reduced toxic emissions. Constant improvements and innovations lead to products that run more economically and reach a higher level of environment compatibility
- The facility should be able to reasonably accommodate access and positioning of possible outsize equipment. Consideration for this possibility should be given from (and including) point of delivery to point of positioning
- It is advisable to allow capacity for extra machinery in the event of increased production demand.
Ergonomic and user-comfort considerations
Sterile services departments should be designed to protect staff from avoidable risks of injury. Badly designed elements such as height, depth and design of workstations and counters, shelving and the layout have an impact on the occupational health and safety of staff. Workspaces should therefore be sufficiently flexible and adaptable to accommodate adequate working space for individual comfort, and to reduce any unnecessary physical stress or risk of injury to the body from any repetitive and/or periodic actions such as lifting, pulling, pushing, etc.
Ergonomics considers the understanding of human-equipment interaction and design to minimise safety risks and achieve the optimum use of equipment. When particular high risks are identified, these should be minimised when designing the facility – while providing good lighting (preferably natural light), adequate ventilation, plenty of space, and comfortable humidity/temperature conditions. Workbenches and chairs must be height-adjustable, allowing staff to adopt the correct posture when sitting or standing.
Enough space must be available to allow for organisation of the workspace. All materials, for example those in the packing area, should be located within easy reach of the workbench (packaging materials, indicators, etc.). A similar concept should apply to device-sorting or manual-cleaning areas. There should be adequate space to manoeuvre, queue, and unload trolleys or other means of transportation. This will allow not only for good ergonomics but also for efficient work practices.
The provision of a pleasant interior environment can contribute to staff morale. Temperature and humidity control (air-conditioning), in particular in areas where heat-associated equipment (such as steam sterilisers and thermal washer-disinfectors) is used, is preferred. Provision must be made for adequate heat extraction systems from heat generating equipment such as autoclaves and instrument washers. This should be done as close to the source as possible i.e. above autoclave doors and instrument washers. This heat source can be utilized to pre-heat water going to the boilers. Consideration should also be given to ensure there is adequate lighting (preferably natural) and noise control.
For larger facilities, provision may need to be made for managers’ offices, general staff areas (for eating and drinking) and storage areas that are separated from the decontamination area. Good interior design also contributes to staff morale. The aim should therefore be to create an attractive and cheerful environment throughout the department.
Sound
Noise must be controlled
- A threshold of 60dBA (decibel) must not be exceeded
- The walls and ceilings should be made of absorbent materials so that they do not reflect sound
- Insulation of sterilisers and washer-disinfectors in technical walls will reduce the noise level
- Offices should allow confidential discussions to take place in privacy, away from noisy mechanical or high-volume human areas.
Natural light
Natural lighting is highly desirable, especially in the work areas, and should be used wherever possible, especially in areas such as the cleaning and packing areas. However, direct sunlight on work spaces should be avoided.
Natural ventilation
Natural ventilation through opening-section windows should be limited to offices and staff rooms. However, this is not recommended as it could promote contamination of the internal space by outside sources. Mechanical ventilation should be provided through the remainder of the CSSD, with good primary and secondary filters which must be monitored with differential manometers linked to an alarm system.
Communication
Provision must be made for communication systems to minimise the passage of staff to and from the clean zone. Glass partitions, communication panels, IT and video links for data transfer, intercom and telephones can serve as appropriate means of communication.
Glass partitions should be used to permit observance of the activities within the clean zone (from the outside) without having to enter it. The glass panels must be of a non-opening design and must be waterproof and flush-mounted.
CSSD Area Determination
Determination of size and layout
The size of a CSSD in a hospital is unique to that hospital, as the size, layout and function of a CSSD are defined in the Operational Policy Statement that guides the operational management of the hospital. The operational policies specific to the CSSD precede sketch design stage. These policies are developed by the project team in consultation with health; service stakeholders, who should have the knowledge and experience to analyse the various processes in and related to the CSSD.
These operational policies define the “What, How, When, Where, Who and With What” of any activity and/or process and are major space determinants which could significantly affect the planning and design of the CSSD, as they can have an impact on the size, configuration and the nature of accommodation. Operational policies will vary from unit to unit depending on a wide range of factors, both external and internal to the CSSD.
Determining factors external to the CSSD
Examples of these space determinants could include the following:
- number of theatres/case mix
- surgical procedures
- extent of storage in the theatres and wards
- distribution system that will be used (vertical, horizontal, trolleys, lifts)
- amount of space needed for waste management
- processing needs for re-usable textiles (receiving, transporting, collecting, storing)
- staff facilities to be shared with adjacent departments. See annexure A for a generic set of Standard Operating Policies (SOP) for a typical sterile service department.
Determining factors internal to the CSSD
Examples of these space determinants could include the following:
- types of processing equipment to be used (washer, washer-disinfectors, single- or multi-chamber washers, ultrasonic cleaners, endoscope processors)
- types of packaging to be used (disposable wraps and pouches, re-usable wraps, rigid containers
- echnology to be used for sterilisation (high temperature or low temperature sterilisation, other chemical sterilants, steam)
- anticipated inventory storage
- anticipated volume of consumable supplies
- type of documentation and record-keeping system to be used (manual vs computerised)
- instrument inventory
- equipment inventory
- projected workload
- staffing structure – number of offices
- staffing policy - number of staff to be accommodated
- types of cleaning equipment selected such as multi chamber or single chamber
- number of sterilisers and whether front or double sided loading
- emergency sterilisation requirements.
CSSD area determination
Hoët (1989 cited in AFS Working Group, 2008b, p.281) has estimated the following ratios as a broadbased calculation of CSSD space:
- 0.7 m²/bed from 0 to 300 beds
- 0.6 m²/bed from 300 to 600 beds
- 0.5 m²/bed for more than 600 beds.
Based on these ratios, the following table can be compiled:
Table 2:mratio of hospital bed to CSSD area
BED SIZE | CALCULATION | SURFACE AREA |
200 BEDS | 0.7 m² /bed | 210 m² |
400 BEDS | 0.6 m² /bed | 240 m² |
600 BEDS | 0.5 m² /bed | 300 m² |
800 BEDS | 0.5 m² /bed | 400 m² |
1000 BEDS | 0.5 m² /bed | 500 m² |
1200 BEDS | 0.5 m² /bed | 600 m² |
AFS Working Group (2008b, p.291) states that the CSSD has few internal corridors, the commonly used net to department functional factor adopted is 1.30. The 1.30 factor anticipates that the internal circulation must be added to connect functional areas and individual rooms. This minimal surface area required can be estimated as being 200m² useful and 260m² net floor areas.
Based on the above assumption, AFS Working Group (2008b, p.291) calculates the useful surface area using the MSO ratio based on the number of beds used for Medical – Surgery – Obstetrics (MSO), using the following calculation basis:
Table 3: Ratio of MSO to CSSD area
MSO – NR OF BEDS | USEFUL SURFACE AREA/BED | USEFUL SURFACE AREA | NET SURFACE AREA |
< 200 BEDS | 200 | 200 m² | 260 m² |
200 – 300 BEDS | 1,5 m² /bed | 300 – 400 m² | 400 - 520 m² |
300 – 400 BEDS | 1,2 m² /bed | 350 – 420 m² | 450 – 550 m² |
450 + BEDS | 1,0 m² /bed | 450 m² | 600 m² |
Studies done by Putsep and Cowan (1983, p.8) produced the following ratios depending on the ‘active’ nature of the bed.
Table 4: Comparative recommendations for estimating the size of a CSSD (Putsep and Cowan,1983, p.8)
NR OF
BEDS |
SCANDINAVIA | BELGIUM | NETHERLANDS | RSA1 |
m² PER BED | ||||
200 BEDS | 1,1 m² /bed | 0,6 - 1 m² /bed | 0,7 m² /bed | 1,0 m² /bed23 |
350 BEDS | 1,1 m² /bed | 0,6 - 1 m² /bed | 0,6 m² /bed | 1,0 m² /bed |
500 BEDS | 1,1 m² /bed | 0,6 - 1 m² /bed | 0,5 m² /bed | 1,0 m² /bed |
750 BEDS | 1,1 m² /bed | 0,6 - 1 m² /bed | 0,4 m² /bed | 1,0 m² /bed |
Based on the above data, the areas are as follows:
NR OF
BEDS |
SCANDINAVIA | BELGIUM | NETHERLANDS | RSA3 |
TOTAL AREA | ||||
200 BEDS | 220 m² | 160 m²*4 | 140 m² | 200 m² |
350 BEDS | 385 m² | 280 m² * | 210 m² | 350 m² |
500 BEDS | 550 m² | 400 m² * | 250 m² | 500 m² |
750 BEDS | 825 m² | 600 m² * | 300 m² | 750 m² |
As the schedules of accommodation on which the above analyses are based have not been included in the study, the equitability of the comparisons is in doubt.
It is however; clear that the size of a CSSD cannot be generically determined on the basis of statistics or averages. Every CSSD has its own set of area determinants that need to be logically evaluated in order to arrive at an area that is the optimal combination of functionality and cost effectiveness.
Proportional allocation of space in a CSSD facility
Table 5: Space allocation in a CSSD (Putsep and Cowan,1983, p.9)
AREA | NUFFIELD
PROVINCIAL HOSPITALS TRUST (1963) |
ESTIMATED
AVERAGE – SWEDISH PRACTICE |
NORWEGIAN
RECOMMENDATIONS (1978) |
HOET
(1981) |
RECEIVING
WASHING DECONTAMINATION |
10 | 19 | 10 | 30 |
CLEAN AREA | 35 | 20 | 25 | 30 |
STERILISATION AREA | 5 | 8 | 5 | 25 |
STERILE SUPPLY | ||||
STORE DISPATCH | 16 | 29 | 25 | |
BULK STORE | 11 | 14 | 20 | 15 |
STAFF AREA
OFFICE HOUSEKEEPING |
23 | 10 | 15 |
AFS Working Group (2008b, p.291) states that the areas within the CSSD can be sub-divided as follows:
Receiving: 10% of the surface area
Decontamination: 25% of the surface area
DIRTY 35%
| |
CLEAN 35%
| |
STERILE 20%
|
SUPPORT 10%
If the generic plan used as basis for this study (LAYOUT 2.1) is subjected to an area analysis, the following table can be compiled (TABLE 4.5) for an autonomous (support services not shared) CSSD of 600m². If staff facilities and corridors are shared with another department (e.g. theatre department), the CSSD’s size reduces to 450m² as per TABLE 4.6, illustrating the difficulty in achieving universally applicable areas, and the effect of hospital-specific policies.
It is significant that the percentage of total areas of TABLE 4.6 compares favourably with the AFS Working Group’s recommendations.
Table 6: Proportional space allocation - Generic layout (600M2 gross area)
DIRTYCLEANSTERILE SUPPORT | ||||
Area (m²) | Area (m²) | Area (m²) | Area (m²) | |
WASTE DISPOSAL | 12 | |||
SLUICE | 12 | |||
RECEIVING & SORTING | 25 | |||
TROLLEY WASH | 5 | |||
TROLLEY HOLDING | 5 | |||
STORE | 12 | |||
PPE TO DECON AREA | 8 | |||
DECONTAMINATION AREA | 100 | |||
PPE TO IAP AREA | 8 | |||
STORE | 12 | |||
TEXTILE AREA | 16 | |||
INSPECTION & PACKING | 100 | |||
STERILIZATION | 30 | |||
DISPATCH | 15 | |||
STERILE STORE | 40 | |||
COOLING | 30 | |||
STERILIZER PLANT ROOM | 18 | |||
OFFICE | 12 | |||
KITCHENETTE | 12 | |||
STAFF REST ROOM | 35 | |||
FEMALE CHANGE | 30 | |||
MALE CHANGE | 15 | |||
CSSD CORRIDOR | 48 | |||
TOTAL AREA (SQ M) | 179 | 166 | 85 | 170 |
% OF TOTAL AREA | 30% | 28% | 14% | 28% |
Table 7: Proportional space allocation - Generic layout without staff facilities (450M2 gross area)
DIRTY CLEAN STERILE SUPPORT | ||||
Area (m²) | Area (m²) | Area (m²) | Area (m²) | |
WASTE DISPOSAL | 12 | |||
SLUICE | 12 | |||
RECEIVING & SORTING | 25 | |||
TROLLEY WASH | 5 | |||
TROLLEY HOLDING | 5 | |||
STORE | 12 | |||
PPE TO DECON AREA | 8 | |||
DECONTAMINATION AREA | 100 | |||
PPE TO IAP AREA | 8 | |||
STORE | 12 | |||
TEXTILE AREA | 16 | |||
INSPECTION & PACKING | 100 | |||
STERILIZATION | 30 | |||
DISPATCH | 15 | |||
STERILE STORE | 40 | |||
COOLING | 30 | |||
STERILIZER PLANT ROOM | 18 | |||
OFFICE | 12 | |||
TOTAL AREA (SQ M) | 179 | 166 | 85 | 30 |
% OF TOTAL AREA | 39% | 36% | 18% | 7% |
Typical Floor Layouts
The following generic plans are included to illustrate the combined effect of gross floor area allocation, proportional space allocation, and work-flow requirements.
Drawing 1: Typical floor layout (Small - 250M² gross area) not to scale Proportional Net space allocation
DIRTY | 37% |
CLEAN | 36% |
STERILE | 21% |
SUPPORT | 6% |
Drawing 2: Typical floor layout (Medium - 400M² gross area) not to scale Proportional Net space allocation
DIRTY | 38% |
CLEAN | 33% |
STERILE | 22% |
SUPPORT | 7% |
Drawing 3: Typical floor layout (Large - 600M² gross area) not to scale Proportional Net space allocation
DIRTY | 30% |
CLEAN | 28% |
STERILE | 14% |
SUPPORT | 28% |
Individual Space Requirements
CSSD Layout Unpacked
Due to the uni-directional sequential nature of the work flow in the CSSD, activities are interrelated and inter-dependent. It is, therefore, critical to the functional efficiency and safety of the CSSD that those areas are sequentially linked for uni-directional flow-through of instrumentation, with no room for back tracking.
The above work flow and interrelationship between the adjacent areas dictates the characteristics of each space. In order to discuss each area individually, it is necessary to have a base plan as a reference point. The typical floor layout based on a 600m2 unit will be used for this purpose.
Drawing 4: A generic layout to illustrate room layouts
Receiving and Sorting
Function
This is the area where all soiled articles for reprocessing are received on trolleys from the main corridor from user departments throughout the hospital.
Location and Relationship
- Close to main entry doors to the CSSD unit
- Visual access to main entry.
Drawing 5: Receiving and sorting
Activities
- Access for deliveries of supplies, return of contaminated goods and the collection of waste and contaminated linen
- Contaminated articles are received at a counter with a trolley hatch, where the articles are logged, sorted and forwarded to the decontamination area
- Contaminated linen is put into linen bags and stored in the waste-disposal store for transport to the laundry
- Supplies are received in the supplies store where they are opened and packaging is discarded in the waste-disposal store
- Trolleys are sent to the trolley wash bay.
Requirements
- Visual access to entrance doors
- All entrances should be secure and controlled by means of communication to prevent access by unauthorised people
- A glass partition with lockable sliding hatch between this area and the corridor • A lockable hatch for trolleys
- The red-line principle is applicable at the receiving area; only material and trolleys are to enter the CSSD via this entrance • Worktop for unpacking and sorting
- Hand-washing facilities.
Fixtures, fittings and equipment
- Receiving counter with pass-through hatch and trolley hatch, acting as red line
- Sorting work tables – standing height
- Clinical hand-wash basin, complete with liquid soap dispenser and paper-towel dispenser • Space should be allowed for record-keeping and record-keeping supplies.
Photograph 7: Trolley pass-through hatch (Tygerberg hospital)
Services
- 2 x telephones
- 2 x data points
- CSSD technician call system
- Power outlets for computer points, computer, fax and printer
- Access control to outside door.
Waste Disposal
Function
Contaminated waste articles are stored for collection and transport to the respective disposal areas.
Location and relationship
Attached to the receiving area.
Drawing 6: Waste disposal
Activities
- The sluice area and waste-disposal area could be combined in smaller units
- Contaminated waste articles are temporarily stored for collection and transport to the respective disposal areas
- Contaminated linen is temporarily stored in canvas bags for collection and transport to the laundry
- Third-party collection area (depot).
Categories of waste stored in the waste-disposal area could include:
- Health-care waste, infectious waste, sharps
- General office waste
- Packaging and cartons from bulk supplies stored in the unit • Linen bags used to collect reusable items
- Sharps from theatres.
Requirements
- An independent secure area for temporary storage of clinical waste awaiting collection in accordance with local waste management policy
- The door to the receiving/sorting area side should be lockable from the CSSD side to prevent unauthorised entry
- Room layout should allow for easy recycling/re-use/disposal policy
- Space for linen bags and waste containers
- An impermeable, hard-wearing floor with good drainage; it should be easy to clean and to disinfect, with an accessible water supply for cleaning purposes
- The area should be protected from outside elements, inaccessible to animals, insects or birds and not situated in close proximity to fresh food stores, food preparation areas or patient waiting areas
- It should be sized according to the volume of waste generated by the facility as well as the frequency of collection.
- A bumper rail to protect the wall behind the trolleys • Containers according to waste policy.
Photograph 8: Soiled-Linen trolleys
Photograph 9: Infectious-waste and sharps-disposal containers
Fixtures, fittings and equipment
• Clinical hand-wash basin, complete with liquid-soap dispenser and paper-towel dispenser.
Sluice
Function
Heavily soiled items are rinsed and waste items are discarded in suitable containers.
4.2. Location and relationship
Please help to expand this page. |