− | Sputum specimen examination is the main diagnostic procedure for pulmonary Tuberculosis <ref>Hansen, D. J., 1993. The Work Environment: Healthcare, Laboratories and Biosafety, Volume 2. Lewis publishers: USA.</ref>; however, the medical procedure (patient coughing) that is used for sputum collection increases the potential for transmission of M. Tuberculosis significantly <ref>Centers for Disease Control and Prevention. Guidelines for Preventing the Transmission of Mycobacterium tuberculosis in Health-Care Settings, 2005. MMWR 2005;54(No. RR-17).</ref>; therefore, there is need to administer sputum collection safely in healthcare facilities <ref>Infrastructure Unit Support Systems (IUSS), 2014. IUSS HEALTH FACILITY GUIDES: TB Services. South Africa. National Department of Health.</ref>. The CSIR’s Infrastructure Innovation research group has conducted many TB risk assessments in South African public healthcare facilities for over 10 years. A common finding was that engineering controls for sputum collection were not always adequate, maintained or monitored. Sputum was observed to be collected from toilets, consulting rooms and counselling rooms which implies increased risk of TB transmission. | + | Sputum specimen examination is the main diagnostic procedure for pulmonary Tuberculosis <ref>Hansen, D. J., 1993. The Work Environment: Healthcare, Laboratories and Biosafety, Volume 2. Lewis publishers: USA.</ref>; however, the medical procedure (patient coughing) that is used for sputum collection increases the potential for transmission of M. Tuberculosis significantly <ref>Centers for Disease Control and Prevention. Guidelines for Preventing the Transmission of Mycobacterium tuberculosis in Health-Care Settings, 2005. MMWR 2005;54(No. RR-17).</ref>; therefore, there is need to administer sputum collection safely in healthcare facilities <ref name=":3">Infrastructure Unit Support Systems (IUSS), 2014. IUSS HEALTH FACILITY GUIDES: TB Services. South Africa. National Department of Health.</ref>. The CSIR’s Infrastructure Innovation research group has conducted many TB risk assessments in South African public healthcare facilities for over 10 years. A common finding was that engineering controls for sputum collection were not always adequate, maintained or monitored. Sputum was observed to be collected from toilets, consulting rooms and counselling rooms which implies increased risk of TB transmission. |
This guideline provide guidance on conducting sputum collection safely for suspected or known infectious TB patients. Although there is a three level hierarchy of control measures; administrative controls, engineering controls and personal respiratory protection to prevent transmission of TB, this guideline is limited to engineering control measures for sputum collection. | This guideline provide guidance on conducting sputum collection safely for suspected or known infectious TB patients. Although there is a three level hierarchy of control measures; administrative controls, engineering controls and personal respiratory protection to prevent transmission of TB, this guideline is limited to engineering control measures for sputum collection. | ||
Line 9: | Line 9: | ||
===Local exhaust ventilation devices=== | ===Local exhaust ventilation devices=== | ||
− | Local exhaust ventilation devices capture of airborne contaminants at or near the source before they are dispersed into the work space <ref name=":0">Burgess, W.A., Ellenbecker, M.J., and Treitman, R.D. 2004. Ventilation for control of the work environment. Second edition. New Jersey USA. John Wiley & Sons</ref><ref name=":1">Heinsohn, P. 1996. Tuberculosis resources guide CEC Report CR 106146. Carlifonia. USA. Heinsohn Consulting services.</ref>. The basic components of an LEV device are hood, ductwork, air cleaner and fan <ref name=":1" />. Burgess, et al.,<ref name=":0" /> identifies two major categories of LEV devices; enclosures and exterior. The major difference between these two is that for enclosures, contaminants are released from inside the device whereas for exterior contaminants are released outside the device. A sputum booth is considered as an example of an enclosure LEV device. Illustrations of an enclosure and exterior LEV devices are shown | + | Local exhaust ventilation devices capture of airborne contaminants at or near the source before they are dispersed into the work space <ref name=":0">Burgess, W.A., Ellenbecker, M.J., and Treitman, R.D. 2004. Ventilation for control of the work environment. Second edition. New Jersey USA. John Wiley & Sons</ref><ref name=":1">Heinsohn, P. 1996. Tuberculosis resources guide CEC Report CR 106146. Carlifonia. USA. Heinsohn Consulting services.</ref>. The basic components of an LEV device are hood, ductwork, air cleaner and fan <ref name=":1" />. Burgess, et al.,<ref name=":0" /> identifies two major categories of LEV devices; enclosures and exterior. The major difference between these two is that for enclosures, contaminants are released from inside the device whereas for exterior contaminants are released outside the device. A sputum booth is considered as an example of an enclosure LEV device. Illustrations of an enclosure and exterior LEV devices are shown below as Mechanical sputum booth. The Mechanical sputum booth was designed by the Infrastructure Innovation unit of the CSIR . [[Technical specifications for CSIR designed sputum booth|Technical specifications for CSIR designed sputum booth.]] |
− | [[File:Mechanical sputum booth.jpg|none|thumb|Mechanical sputum booth]] | + | [[File:Mechanical sputum booth.jpg|none|thumb|Mechanical sputum booth]]Comparison between enclosure and exterior LEV devices is shown in Table below.<br /> |
− | + | ||
+ | Comparison between enclosure and exterior LEV devices | ||
{| class="wikitable" | {| class="wikitable" | ||
|'''Local Exhaust Ventilation device''' | |'''Local Exhaust Ventilation device''' | ||
Line 20: | Line 21: | ||
|'''''Enclosure''''' | |'''''Enclosure''''' | ||
− | Contaminants are released from inside the LEV device. Example is | + | Contaminants are released from inside the LEV device. Example Mechanical sputum booth is shown above. |
| | | | ||
*Complete physical separation between patient and staff which ensures negligible exposure to contaminants hence providing the greatest protection when compared to exterior <ref name=":0" />. | *Complete physical separation between patient and staff which ensures negligible exposure to contaminants hence providing the greatest protection when compared to exterior <ref name=":0" />. | ||
Line 35: | Line 36: | ||
|'''''Exterior''''' | |'''''Exterior''''' | ||
− | Contaminants are released from outside the LEV device. Example is illustrated | + | Contaminants are released from outside the LEV device. Example exterior LEV is illustrated above.<br /> |
− | <br /> | ||
| | | | ||
*Cost is relatively low compared to complete enclosures. | *Cost is relatively low compared to complete enclosures. | ||
Line 49: | Line 49: | ||
==='''Sputum collection room'''=== | ==='''Sputum collection room'''=== | ||
+ | This room should meet the following requirements: | ||
+ | |||
+ | *It should be mechanically ventilated. | ||
+ | *It should be designed with negative air pressure with respect to adjacent spaces so that air flows from adjacent spaces into the room. | ||
+ | *The ventilation rate of the room should be at least 12 ACH. | ||
+ | |||
<br /> | <br /> | ||
+ | {| class="wikitable" | ||
+ | |Engineering control measure | ||
+ | |Advantages | ||
+ | |Disadvantages | ||
+ | |- | ||
+ | |Sputum Induction Rooms | ||
− | ==='''Testing | + | The room should meet all the requirements stated in section 2.2. |
+ | | | ||
+ | *Provides complete separation between staff and patients | ||
+ | *If a negative pressure isolation room is available, sputum induction can be done in this room with no additional ventilation equipment. | ||
+ | | | ||
+ | *Separate designated room required | ||
+ | *If a negative pressure isolation room is not available, these rooms require installation of dedicated exhaust systems or HEPA filtration systems prior to recirculation of air. | ||
+ | *Airborne particle clearance times will be high due to lower ACH rates when compared to enclosure LEV devices. | ||
+ | *Room ventilation system must be monitored to ensure proper operation | ||
+ | *Most expensive option if an existing negative pressure isolation room is not available | ||
+ | |} | ||
+ | |||
+ | ==='''Testing of LEV devices and sputum collection room'''=== | ||
+ | Testing and monitoring of the LEV devices and sputum collection rooms is done to ensure correct continued operation of the systems. | ||
{| class="wikitable" | {| class="wikitable" | ||
|+ | |+ | ||
Line 61: | Line 86: | ||
!Perfomance specification guideline/ standard | !Perfomance specification guideline/ standard | ||
|- | |- | ||
− | |Airflow direction | + | |Air pressure difference |
− | | | + | |'''Sputum induction room, Enclosure LEV''' |
− | | | + | |'''Daily inspection''' |
− | |2.3. | + | |2.4.1 |
− | | | + | |'''Electronic micromanometer, mechanical differential pressure gauge (magnehelic gauge)''' |
− | | | + | |'''Greater than -2.5Pa'''<ref name=":2">Sehulster LM, Chinn RYW, Arduino MJ, Carpenter J, Donlan R, Ashford D, Besser R, Fields B, McNeil MM, Whitney C, Wong S, Juranek D, Cleveland J. Guidelines for environmental infection control in health-care facilities. Recommendations from CDC and the Healthcare Infection Control Practices Advisory Committee (HICPAC). Chicago IL; American Society for Healthcare Engineering/American Hospital Association; 2004.</ref>'''.''' |
+ | |- | ||
+ | |Total air flow rate measurement | ||
+ | |'''Sputum induction room, Enclosure LEV''' | ||
+ | |'''Once every 6 months''' | ||
+ | |2.4.2 | ||
+ | |'''Flowhood with flowmeter or a combination of flowhood and anemometer (thermal or vane)''' | ||
+ | |'''Greater than or equal to 12 ACH for sputum induction room'''<ref name=":2" />'''.''' | ||
+ | |- | ||
+ | |Airflow direction and visualisation | ||
+ | |'''Sputum induction room, Enclosure LEV''' | ||
+ | |'''Daily inspection''' | ||
+ | |2.4.3 | ||
+ | |'''Silk thread, Smoke Tubes, nicotine free electronic cigarettes.''' | ||
+ | |'''Air should flow into the room and into LEV'''<ref name=":2" /> | ||
+ | |- | ||
+ | |Installed HEPA filter system leakage | ||
+ | |'''Enclosure LEV''' | ||
+ | |'''Once every 6 months''' | ||
+ | |2.4.4 | ||
+ | |'''Aerosol generator as per ISO 14644:3 section C.6.3 and aerosol photometer''' | ||
+ | |'''Filter penetration should not exceed 0,05% as per EN1822 standard.''' | ||
+ | |} | ||
+ | |||
+ | ==='''Test Methods'''=== | ||
+ | |||
+ | ===='''Air pressure difference test'''==== | ||
+ | The test is perfomed to verify the capability of the enclosure LEV and sputum induction room to maintain the specified pressure difference with respect to adjacent spaces. The test should be done with all doors closed. Permanent measuring points should be installed. | ||
+ | |||
+ | ===='''Total air flow rate measurement'''==== | ||
+ | Measurement of total airflow rate is carried out to calculate the clean air volume supplied to the Sputum induction room and Enclosure LEV per unit time, and this value can be used to calculate the air changes per unit time and airborne particle clearance times. | ||
+ | |||
+ | ===='''Airflow direction and visualisation'''==== | ||
+ | The purpose of airflow direction tests and visualisation is to confirm that the airflow direction conform to the design and performance specification and also to test for stagnant zones of sputum induction room and Enclosure LEV. | ||
+ | |||
+ | ===='''Installed HEPA filter system leakage'''==== | ||
+ | The test is perfomed to confirm that the HEPA filter is properly installed by verifying the absence of bypass leakage in the installation and that the filter is free of defects (small holes and damages in the filter medium and frame seal). The test is perfomed by introducing a 0.5µm to 0.7µm (as per ISO 14644:3 section B.6.2.2) aerosol upstream and scanning downstream of the filter. | ||
+ | |||
+ | |||
+ | ===='''Maintenance of LEV devices and sputum collection room'''==== | ||
+ | The required maintenance activities, interval, responsible person are detailed in Table below. | ||
+ | {| class="wikitable" | ||
+ | |Maintenance activity | ||
+ | |Engineering control | ||
+ | |Time interval | ||
+ | |Responsible person | ||
+ | |- | ||
+ | |Visual inspection of pressure gauges for HEPA and pre-filters | ||
+ | |Enclosure and exterior LEV and sputum room | ||
+ | |Daily | ||
+ | |Facility maintenance personnel | ||
+ | |- | ||
+ | |Check fan failure | ||
+ | |Enclosure and exterior LEV and sputum room | ||
+ | |Weekly | ||
+ | |Facility maintenance personnel | ||
|- | |- | ||
− | | | + | |Replace fan |
− | | | + | |Enclosure and exterior LEV and sputum room |
− | | | + | |As needed according to manufacturer's maintenance manual |
− | | | + | |Qualified engineering specialist |
− | |||
− | |||
|- | |- | ||
− | | | + | |Replace HEPA filter |
− | | | + | |Enclosure and exterior LEV and sputum room |
− | | | + | |When HEPA filter pressure gauge above 500Pa |
− | | | + | |Qualified engineering specialist |
− | |||
− | |||
|- | |- | ||
− | | | + | |Replace pre filter |
− | | | + | |Enclosure and exterior LEV and sputum room |
− | | | + | |When filter pressure gauge is above 250Pa |
− | | | + | |Qualified engineering specialist |
− | |||
− | |||
|- | |- | ||
− | | | + | |Replace pressure gauges |
− | | | + | |Enclosure and exterior LEV and sputum room |
− | | | + | |As needed according to manufacture's maintenance manual |
− | | | + | |Qualified engineering specialist |
− | |||
− | |||
|} | |} | ||
− | ==== | + | ===Outdoor sputum collection site=== |
+ | The outdoor naturally sputum collection site should be located away from people and open doors. The TB services guideline<ref name=":3" /> recommends a distance of at least 4m away from the buildings. An example outdoor sputum collection site is shown in Annexure 2 of the [[TB Services|TB services guideline.]] | ||
+ | <br /> | ||
+ | |||
+ | ===Factors to consider when procuring sputum booth=== | ||
+ | This guideline proposes an initial sputum collection risk assessment to be conducted before procuring a new sputum collection facility. The decision chart below can be used to establish the necessity for the procurement of a sputum collection facility and for the procurement of an appropriate sputum collection device.<br /> | ||
+ | [[File:Process to follow when procuring sputum collection facility.jpg|thumb|548x548px|Process to follow when procuring sputum collection facility|alt=|left]] | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
===References=== | ===References=== |
Latest revision as of 09:05, 19 October 2020
Please help to expand this page. The reason given is: Article still under active review |
Contents
- 1 Introduction
- 2 Engineering control measures for sputum collection
Introduction
Sputum specimen examination is the main diagnostic procedure for pulmonary Tuberculosis [1]; however, the medical procedure (patient coughing) that is used for sputum collection increases the potential for transmission of M. Tuberculosis significantly [2]; therefore, there is need to administer sputum collection safely in healthcare facilities [3]. The CSIR’s Infrastructure Innovation research group has conducted many TB risk assessments in South African public healthcare facilities for over 10 years. A common finding was that engineering controls for sputum collection were not always adequate, maintained or monitored. Sputum was observed to be collected from toilets, consulting rooms and counselling rooms which implies increased risk of TB transmission. This guideline provide guidance on conducting sputum collection safely for suspected or known infectious TB patients. Although there is a three level hierarchy of control measures; administrative controls, engineering controls and personal respiratory protection to prevent transmission of TB, this guideline is limited to engineering control measures for sputum collection.
Engineering control measures for sputum collection
There are two main types of engineering methodologies that can be utilized for sputum collection; local exhaust ventilation devices and sputum collection/induction rooms.
Local exhaust ventilation devices
Local exhaust ventilation devices capture of airborne contaminants at or near the source before they are dispersed into the work space [4][5]. The basic components of an LEV device are hood, ductwork, air cleaner and fan [5]. Burgess, et al.,[4] identifies two major categories of LEV devices; enclosures and exterior. The major difference between these two is that for enclosures, contaminants are released from inside the device whereas for exterior contaminants are released outside the device. A sputum booth is considered as an example of an enclosure LEV device. Illustrations of an enclosure and exterior LEV devices are shown below as Mechanical sputum booth. The Mechanical sputum booth was designed by the Infrastructure Innovation unit of the CSIR . Technical specifications for CSIR designed sputum booth.
Comparison between enclosure and exterior LEV devices is shown in Table below.
Comparison between enclosure and exterior LEV devices
Local Exhaust Ventilation device | Advantages | Disadvantages |
Enclosure
Contaminants are released from inside the LEV device. Example Mechanical sputum booth is shown above. |
|
|
Exterior
Contaminants are released from outside the LEV device. Example exterior LEV is illustrated above. |
|
|
Sputum collection room
This room should meet the following requirements:
- It should be mechanically ventilated.
- It should be designed with negative air pressure with respect to adjacent spaces so that air flows from adjacent spaces into the room.
- The ventilation rate of the room should be at least 12 ACH.
Engineering control measure | Advantages | Disadvantages |
Sputum Induction Rooms
The room should meet all the requirements stated in section 2.2. |
|
|
Testing of LEV devices and sputum collection room
Testing and monitoring of the LEV devices and sputum collection rooms is done to ensure correct continued operation of the systems.
Test | Engineering control | Recommended frequency of testing | Test method | Apparatus | Perfomance specification guideline/ standard |
---|---|---|---|---|---|
Air pressure difference | Sputum induction room, Enclosure LEV | Daily inspection | 2.4.1 | Electronic micromanometer, mechanical differential pressure gauge (magnehelic gauge) | Greater than -2.5Pa[6]. |
Total air flow rate measurement | Sputum induction room, Enclosure LEV | Once every 6 months | 2.4.2 | Flowhood with flowmeter or a combination of flowhood and anemometer (thermal or vane) | Greater than or equal to 12 ACH for sputum induction room[6]. |
Airflow direction and visualisation | Sputum induction room, Enclosure LEV | Daily inspection | 2.4.3 | Silk thread, Smoke Tubes, nicotine free electronic cigarettes. | Air should flow into the room and into LEV[6] |
Installed HEPA filter system leakage | Enclosure LEV | Once every 6 months | 2.4.4 | Aerosol generator as per ISO 14644:3 section C.6.3 and aerosol photometer | Filter penetration should not exceed 0,05% as per EN1822 standard. |
Test Methods
Air pressure difference test
The test is perfomed to verify the capability of the enclosure LEV and sputum induction room to maintain the specified pressure difference with respect to adjacent spaces. The test should be done with all doors closed. Permanent measuring points should be installed.
Total air flow rate measurement
Measurement of total airflow rate is carried out to calculate the clean air volume supplied to the Sputum induction room and Enclosure LEV per unit time, and this value can be used to calculate the air changes per unit time and airborne particle clearance times.
Airflow direction and visualisation
The purpose of airflow direction tests and visualisation is to confirm that the airflow direction conform to the design and performance specification and also to test for stagnant zones of sputum induction room and Enclosure LEV.
Installed HEPA filter system leakage
The test is perfomed to confirm that the HEPA filter is properly installed by verifying the absence of bypass leakage in the installation and that the filter is free of defects (small holes and damages in the filter medium and frame seal). The test is perfomed by introducing a 0.5µm to 0.7µm (as per ISO 14644:3 section B.6.2.2) aerosol upstream and scanning downstream of the filter.
Maintenance of LEV devices and sputum collection room
The required maintenance activities, interval, responsible person are detailed in Table below.
Maintenance activity | Engineering control | Time interval | Responsible person |
Visual inspection of pressure gauges for HEPA and pre-filters | Enclosure and exterior LEV and sputum room | Daily | Facility maintenance personnel |
Check fan failure | Enclosure and exterior LEV and sputum room | Weekly | Facility maintenance personnel |
Replace fan | Enclosure and exterior LEV and sputum room | As needed according to manufacturer's maintenance manual | Qualified engineering specialist |
Replace HEPA filter | Enclosure and exterior LEV and sputum room | When HEPA filter pressure gauge above 500Pa | Qualified engineering specialist |
Replace pre filter | Enclosure and exterior LEV and sputum room | When filter pressure gauge is above 250Pa | Qualified engineering specialist |
Replace pressure gauges | Enclosure and exterior LEV and sputum room | As needed according to manufacture's maintenance manual | Qualified engineering specialist |
Outdoor sputum collection site
The outdoor naturally sputum collection site should be located away from people and open doors. The TB services guideline[3] recommends a distance of at least 4m away from the buildings. An example outdoor sputum collection site is shown in Annexure 2 of the TB services guideline.
Factors to consider when procuring sputum booth
This guideline proposes an initial sputum collection risk assessment to be conducted before procuring a new sputum collection facility. The decision chart below can be used to establish the necessity for the procurement of a sputum collection facility and for the procurement of an appropriate sputum collection device.
References
- ↑ Hansen, D. J., 1993. The Work Environment: Healthcare, Laboratories and Biosafety, Volume 2. Lewis publishers: USA.
- ↑ Centers for Disease Control and Prevention. Guidelines for Preventing the Transmission of Mycobacterium tuberculosis in Health-Care Settings, 2005. MMWR 2005;54(No. RR-17).
- ↑ 3.0 3.1 Infrastructure Unit Support Systems (IUSS), 2014. IUSS HEALTH FACILITY GUIDES: TB Services. South Africa. National Department of Health.
- ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 Burgess, W.A., Ellenbecker, M.J., and Treitman, R.D. 2004. Ventilation for control of the work environment. Second edition. New Jersey USA. John Wiley & Sons
- ↑ 5.0 5.1 Heinsohn, P. 1996. Tuberculosis resources guide CEC Report CR 106146. Carlifonia. USA. Heinsohn Consulting services.
- ↑ 6.0 6.1 6.2 Sehulster LM, Chinn RYW, Arduino MJ, Carpenter J, Donlan R, Ashford D, Besser R, Fields B, McNeil MM, Whitney C, Wong S, Juranek D, Cleveland J. Guidelines for environmental infection control in health-care facilities. Recommendations from CDC and the Healthcare Infection Control Practices Advisory Committee (HICPAC). Chicago IL; American Society for Healthcare Engineering/American Hospital Association; 2004.