===General=== | ===General=== | ||
− | + | Where reference is made to Contractor, it shall be read to mean the successful bidder appointed to execute the contract. | |
− | |||
===Materials and workmanship=== | ===Materials and workmanship=== | ||
+ | All apparatus, components parts, fittings and materials supplied and/or installed whether especially specified herein or not shall conform in respect of quality, manufacture, tests and performance with the requirements of the appropriate current South African (SABS) or British Standard Specifications (BS). | ||
− | + | All materials and workmanship which may, in the opinion of the CSIR, be inferior to that specified for the work shall be condemned. All condemned material and workmanship must be replaced or rectified as the case may be, to the satisfaction of the CSIR. | |
− | === | + | === Performance specifications === |
− | === | + | ==== Supply Air flow rate ==== |
+ | Supply air flow rate shall be at least 2100 m<sup>3</sup>/h measured as specified herein | ||
− | === | + | ==== Air exchange rate ==== |
+ | The sputum collection booth ventilation rate shall be at least 800 Air Changes per Hour (ACH). | ||
− | === | + | ==== Booth internal air pressure requirements ==== |
+ | The booth shall maintain a negative air pressure with respect to adjacent spaces during operation. No outward airflow is permitted during closed door operation. | ||
− | === | + | ==== Aerosol filtration requirements ==== |
+ | The HEPA filter shall achieve a filtration efficiency of not less than 99.95% when tested as per section 6.4.1 – 6.4.3. | ||
− | === | + | ==== Noise levels ==== |
+ | Acoustical noise levels shall be compliant with §'''Error! Reference source not found.''' when tested in accordance with ISO 3743-1 and ISO 3743-2 | ||
− | === | + | === Design specifications === |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
+ | ==== Booth dimensions ==== | ||
Booth inner dimensions (mm) shall be 1600Lx734Wx1900H. | Booth inner dimensions (mm) shall be 1600Lx734Wx1900H. | ||
Booth outer dimensions (mm) shall be 2000Lx740Wx2000H. | Booth outer dimensions (mm) shall be 2000Lx740Wx2000H. | ||
− | Configuration of aerosol filtration system and fan | + | ==== Configuration of aerosol filtration system and fan ==== |
− | |||
Aerosol filtration system (pre and HEPA filters) and fan shall be configured as shown in the schematic diagram of Figure 2. | Aerosol filtration system (pre and HEPA filters) and fan shall be configured as shown in the schematic diagram of Figure 2. | ||
− | Internal booth surfaces | + | ==== Internal booth surfaces ==== |
− | |||
The internal surfaces of the booth shall be impervious (no gaps or voids), able to withstand regular and vigorous cleaning, washable and easily disinfected. | The internal surfaces of the booth shall be impervious (no gaps or voids), able to withstand regular and vigorous cleaning, washable and easily disinfected. | ||
− | Filtration housing | + | ==== Filtration housing ==== |
− | |||
Filtration housing for the Pre and HEPA filter shall be N G™ filter duct housings. | Filtration housing for the Pre and HEPA filter shall be N G™ filter duct housings. | ||
− | Plenum | + | ==== Plenum ==== |
− | |||
The plenum shall be detachable from the booth See Figure 3. | The plenum shall be detachable from the booth See Figure 3. | ||
4 lockable or retractable wheels shall be provided to the plenum for mobility. | 4 lockable or retractable wheels shall be provided to the plenum for mobility. | ||
− | Inlet air filtration | + | ==== Inlet air filtration ==== |
− | |||
A G4 air filter matt shall be situated over the fresh-air intake screen. | A G4 air filter matt shall be situated over the fresh-air intake screen. | ||
− | Location of supply air grill | + | ==== Location of supply air grill ==== |
− | |||
The perforated supply air grille shall be located on the ceiling of the booth and shall have an open area of not less than 50% and a hole shape aspect ratio of 1:1. | The perforated supply air grille shall be located on the ceiling of the booth and shall have an open area of not less than 50% and a hole shape aspect ratio of 1:1. | ||
Line 68: | Line 55: | ||
The thickness of the grille shall be at least 0.8 mm. | The thickness of the grille shall be at least 0.8 mm. | ||
− | High Efficiency Particulate Air (HEPA) filter | + | ==== High Efficiency Particulate Air (HEPA) filter ==== |
− | |||
An EN 1822 H13 Grade HEPA filter shall be installed as per arrangement shown in the schematic diagram Figure 2. | An EN 1822 H13 Grade HEPA filter shall be installed as per arrangement shown in the schematic diagram Figure 2. | ||
− | Fan | + | ==== Fan ==== |
− | |||
Fan shall be an automatic step less variable speed fan. | Fan shall be an automatic step less variable speed fan. | ||
− | Pre Filter | + | ==== Pre Filter ==== |
− | |||
An F9 filter shall be installed as per arrangement shown in the schematic diagram Figure 2. | An F9 filter shall be installed as per arrangement shown in the schematic diagram Figure 2. | ||
− | Booth lighting | + | ==== Booth lighting ==== |
− | |||
LED lighting strips shall be installed along the inside gloss white walls above head height. | LED lighting strips shall be installed along the inside gloss white walls above head height. | ||
− | Sputum cup holder | + | ==== Sputum cup holder ==== |
− | |||
The sputum cup holder shall be installed along the inside wall of the booth below the window as shown in Figure 3. | The sputum cup holder shall be installed along the inside wall of the booth below the window as shown in Figure 3. | ||
The material of the cup holder shall be Perspex or Stainless steel. | The material of the cup holder shall be Perspex or Stainless steel. | ||
− | Seat | + | ==== Seat ==== |
− | |||
The seat shall be foldable and able to withstand a dynamic load of 150 kg. | The seat shall be foldable and able to withstand a dynamic load of 150 kg. | ||
− | Window | + | ==== Window ==== |
− | |||
A window shall be installed as per schematic diagram of Figure 2. | A window shall be installed as per schematic diagram of Figure 2. | ||
− | Pressure gauges | + | ==== Pressure gauges ==== |
− | |||
Pressure gauges with a maximum range of 500 Pa shall be installed across the HEPA filter and the pre filter. | Pressure gauges with a maximum range of 500 Pa shall be installed across the HEPA filter and the pre filter. | ||
− | Automatic door lock system | + | ==== Automatic door lock system ==== |
− | |||
Automatic door lock system shall be installed. | Automatic door lock system shall be installed. | ||
The control logic for the door shall be as per Figure 1. | The control logic for the door shall be as per Figure 1. | ||
− | Electrical Supply and Safety | + | ==== Electrical Supply and Safety ==== |
− | |||
The booth power shall be supplied by standard IEC Type M 230V 50Hz single phase power outlet | The booth power shall be supplied by standard IEC Type M 230V 50Hz single phase power outlet | ||
Line 118: | Line 95: | ||
The requirements of SANS 60335-1:2018 “Household and similar electrical appliances – Safety” shall apply | The requirements of SANS 60335-1:2018 “Household and similar electrical appliances – Safety” shall apply | ||
− | DRAWINGS | + | === DRAWINGS === |
− | |||
Figures 2&3 are presented for general arrangement purposes. | Figures 2&3 are presented for general arrangement purposes. | ||
The contractor shall prepare shop drawings which shall show in detail the construction of all the parts, method of assembly where applicable, materials and connections, sealants, fastenings and all other necessary details. | The contractor shall prepare shop drawings which shall show in detail the construction of all the parts, method of assembly where applicable, materials and connections, sealants, fastenings and all other necessary details. | ||
− | Installation | + | === Installation === |
− | |||
− | |||
+ | ==== Indoor location of booth ==== | ||
The sputum booth shall not be located close to open windows and doors. | The sputum booth shall not be located close to open windows and doors. | ||
The sputum booth shall not align with commonly viewed items such as notice boards, monitors, televisions etc. | The sputum booth shall not align with commonly viewed items such as notice boards, monitors, televisions etc. | ||
− | The CEOs or infection control managers of the facilities | + | The CEOs or infection control managers of the facilities shall allocate the exact installation location within the facility. |
The contractor shall allow in his tender price for the transportation costs of booths to installation sites. | The contractor shall allow in his tender price for the transportation costs of booths to installation sites. | ||
− | Commissioning | + | === Commissioning === |
− | |||
− | |||
+ | ==== Testing responsibility ==== | ||
The contractor shall allow in his tender price for the services of appropriately certified commissioning technicians or engineers. | The contractor shall allow in his tender price for the services of appropriately certified commissioning technicians or engineers. | ||
− | Airflow direction tests | + | ==== Airflow direction tests ==== |
− | |||
Airflow direction tests to confirm negative booth pressure shall be conducted as per ISO 14644:3 section B8. | Airflow direction tests to confirm negative booth pressure shall be conducted as per ISO 14644:3 section B8. | ||
− | Booth ventilation rate | + | ==== Booth ventilation rate ==== |
− | |||
Booth ventilation rate shall be tested as per ISO 14644:3 for non-unidirectional airflow system. The test shall be conducted at the exhaust air terminal. | Booth ventilation rate shall be tested as per ISO 14644:3 for non-unidirectional airflow system. The test shall be conducted at the exhaust air terminal. | ||
− | HEPA Filter integral efficiency test | + | ==== HEPA Filter integral efficiency test ==== |
− | |||
HEPA Filter integral efficiency test shall be as per ISO 14644:3. | HEPA Filter integral efficiency test shall be as per ISO 14644:3. | ||
Line 158: | Line 129: | ||
Challenge aerosol concentration in the booth shall be as per ISO 14644:3 section B.6.2.3. | Challenge aerosol concentration in the booth shall be as per ISO 14644:3 section B.6.2.3. | ||
− | MAINTENANCE AND PERFORMANCE MONITORING | + | === MAINTENANCE AND PERFORMANCE MONITORING === |
− | |||
The contractor shall maintain good working order of the sputum collection booth for 2 years after installation. | The contractor shall maintain good working order of the sputum collection booth for 2 years after installation. | ||
Line 166: | Line 136: | ||
The maintenance plan shall include maintenance activities and performance monitoring. | The maintenance plan shall include maintenance activities and performance monitoring. | ||
− | + | === GUARANTEE PERIODS === | |
− | GUARANTEE PERIODS | ||
− | |||
The contractor shall guarantee that spare parts will be available for the expected lifetime of the sputum collection booth and for a period of at least ten years from procurement date. | The contractor shall guarantee that spare parts will be available for the expected lifetime of the sputum collection booth and for a period of at least ten years from procurement date. | ||
Line 175: | Line 143: | ||
Contractors are obliged to refund, repair or replace the failed, unsafe and defective goods. | Contractors are obliged to refund, repair or replace the failed, unsafe and defective goods. | ||
− | Documentation | + | === Documentation === |
− | |||
The following reports and records shall be provided upon handover: | The following reports and records shall be provided upon handover: | ||
Line 195: | Line 162: | ||
g) Decommissioning and disposal plan | g) Decommissioning and disposal plan | ||
− | + | === TRAINING === | |
− | TRAINING | ||
− | |||
Training of onsite maintenance personnel and sister in charge by the contractor in the operation, dismantling and cleaning of the sputum collection booth shall be included in the offer. | Training of onsite maintenance personnel and sister in charge by the contractor in the operation, dismantling and cleaning of the sputum collection booth shall be included in the offer. |
Latest revision as of 17:59, 18 October 2020
Contents
- 1 General
- 2 Materials and workmanship
- 3 Performance specifications
- 4 Design specifications
- 4.1 Booth dimensions
- 4.2 Configuration of aerosol filtration system and fan
- 4.3 Internal booth surfaces
- 4.4 Filtration housing
- 4.5 Plenum
- 4.6 Inlet air filtration
- 4.7 Location of supply air grill
- 4.8 High Efficiency Particulate Air (HEPA) filter
- 4.9 Fan
- 4.10 Pre Filter
- 4.11 Booth lighting
- 4.12 Sputum cup holder
- 4.13 Seat
- 4.14 Window
- 4.15 Pressure gauges
- 4.16 Automatic door lock system
- 4.17 Electrical Supply and Safety
- 5 DRAWINGS
- 6 Installation
- 7 Commissioning
- 8 MAINTENANCE AND PERFORMANCE MONITORING
- 9 GUARANTEE PERIODS
- 10 Documentation
- 11 TRAINING
General
Where reference is made to Contractor, it shall be read to mean the successful bidder appointed to execute the contract.
Materials and workmanship
All apparatus, components parts, fittings and materials supplied and/or installed whether especially specified herein or not shall conform in respect of quality, manufacture, tests and performance with the requirements of the appropriate current South African (SABS) or British Standard Specifications (BS).
All materials and workmanship which may, in the opinion of the CSIR, be inferior to that specified for the work shall be condemned. All condemned material and workmanship must be replaced or rectified as the case may be, to the satisfaction of the CSIR.
Performance specifications
Supply Air flow rate
Supply air flow rate shall be at least 2100 m3/h measured as specified herein
Air exchange rate
The sputum collection booth ventilation rate shall be at least 800 Air Changes per Hour (ACH).
Booth internal air pressure requirements
The booth shall maintain a negative air pressure with respect to adjacent spaces during operation. No outward airflow is permitted during closed door operation.
Aerosol filtration requirements
The HEPA filter shall achieve a filtration efficiency of not less than 99.95% when tested as per section 6.4.1 – 6.4.3.
Noise levels
Acoustical noise levels shall be compliant with §Error! Reference source not found. when tested in accordance with ISO 3743-1 and ISO 3743-2
Design specifications
Booth dimensions
Booth inner dimensions (mm) shall be 1600Lx734Wx1900H.
Booth outer dimensions (mm) shall be 2000Lx740Wx2000H.
Configuration of aerosol filtration system and fan
Aerosol filtration system (pre and HEPA filters) and fan shall be configured as shown in the schematic diagram of Figure 2.
Internal booth surfaces
The internal surfaces of the booth shall be impervious (no gaps or voids), able to withstand regular and vigorous cleaning, washable and easily disinfected.
Filtration housing
Filtration housing for the Pre and HEPA filter shall be N G™ filter duct housings.
Plenum
The plenum shall be detachable from the booth See Figure 3.
4 lockable or retractable wheels shall be provided to the plenum for mobility.
Inlet air filtration
A G4 air filter matt shall be situated over the fresh-air intake screen.
Location of supply air grill
The perforated supply air grille shall be located on the ceiling of the booth and shall have an open area of not less than 50% and a hole shape aspect ratio of 1:1.
The grille shall be configured to ensure an even supply airflow distribution throughout the sputum collection booth.
The thickness of the grille shall be at least 0.8 mm.
High Efficiency Particulate Air (HEPA) filter
An EN 1822 H13 Grade HEPA filter shall be installed as per arrangement shown in the schematic diagram Figure 2.
Fan
Fan shall be an automatic step less variable speed fan.
Pre Filter
An F9 filter shall be installed as per arrangement shown in the schematic diagram Figure 2.
Booth lighting
LED lighting strips shall be installed along the inside gloss white walls above head height.
Sputum cup holder
The sputum cup holder shall be installed along the inside wall of the booth below the window as shown in Figure 3.
The material of the cup holder shall be Perspex or Stainless steel.
Seat
The seat shall be foldable and able to withstand a dynamic load of 150 kg.
Window
A window shall be installed as per schematic diagram of Figure 2.
Pressure gauges
Pressure gauges with a maximum range of 500 Pa shall be installed across the HEPA filter and the pre filter.
Automatic door lock system
Automatic door lock system shall be installed.
The control logic for the door shall be as per Figure 1.
Electrical Supply and Safety
The booth power shall be supplied by standard IEC Type M 230V 50Hz single phase power outlet
The fan and fan controller shall comply with the safety requirements of SANS 60335-2-80:2016 “Particular requirements for fans”.
The requirements of SANS 60335-2-65:2015 “Particular requirements for air-cleaning appliances” shall apply
The requirements of SANS 60335-1:2018 “Household and similar electrical appliances – Safety” shall apply
DRAWINGS
Figures 2&3 are presented for general arrangement purposes.
The contractor shall prepare shop drawings which shall show in detail the construction of all the parts, method of assembly where applicable, materials and connections, sealants, fastenings and all other necessary details.
Installation
Indoor location of booth
The sputum booth shall not be located close to open windows and doors.
The sputum booth shall not align with commonly viewed items such as notice boards, monitors, televisions etc.
The CEOs or infection control managers of the facilities shall allocate the exact installation location within the facility.
The contractor shall allow in his tender price for the transportation costs of booths to installation sites.
Commissioning
Testing responsibility
The contractor shall allow in his tender price for the services of appropriately certified commissioning technicians or engineers.
Airflow direction tests
Airflow direction tests to confirm negative booth pressure shall be conducted as per ISO 14644:3 section B8.
Booth ventilation rate
Booth ventilation rate shall be tested as per ISO 14644:3 for non-unidirectional airflow system. The test shall be conducted at the exhaust air terminal.
HEPA Filter integral efficiency test
HEPA Filter integral efficiency test shall be as per ISO 14644:3.
Challenge aerosol particle size shall be as per ISO 14644:3 section B.6.2.2
Challenge aerosol concentration in the booth shall be as per ISO 14644:3 section B.6.2.3.
MAINTENANCE AND PERFORMANCE MONITORING
The contractor shall maintain good working order of the sputum collection booth for 2 years after installation.
Fully comprehensive two year maintenance and monitoring plan including all costs shall be provided by the contractor.
The maintenance plan shall include maintenance activities and performance monitoring.
GUARANTEE PERIODS
The contractor shall guarantee that spare parts will be available for the expected lifetime of the sputum collection booth and for a period of at least ten years from procurement date.
The guarantee must cover all items against manufacturing defects, installation, commissioning, materials and workmanship. Should manufacturing defects be detected within a 30-day period, the supplier shall replace the equipment with a new one.
Contractors are obliged to refund, repair or replace the failed, unsafe and defective goods.
Documentation
The following reports and records shall be provided upon handover:
1) Manual including:
a) Operating instructions
b) Maintenance schedule and instructions
c) Shop drawings
d) All tests reports
e) Material data sheets
f) Equipment data sheets
g) Decommissioning and disposal plan
TRAINING
Training of onsite maintenance personnel and sister in charge by the contractor in the operation, dismantling and cleaning of the sputum collection booth shall be included in the offer.